|
|
Lift the Body off the frame to install new polyurethane bushings and a 2" Body Lift kit
Removed the old Rubber OEM Body bushings and installing the new polyurethane bushings
Had to make new lower body mount washers
New polyurethane bushings and the 2" body lift installed
POR 15 to the Frame
Frame Rails with POR 15
Alternator and Air Pump before cleaning
New Master Brake cylinder and the old A/C Compressor clutch
Before steam Cleaning the engine
Replacing all rubber hoses
Installing plastic wire wraps
Engine parts primed after being sand blasted
Parts installed back on to the engine after cleaned and painted |
|
Send mail to
Jeff@rietzusa.com with
questions or comments about this web site.
|